Ngapara 70 Bale

Client:North Otago Client
Location:Ngapara

The Challenge: 

To supply and install a 70 Bail Milking Parlour,Milkplant, Shed and relative   in 3 Months 

The Solution:

With the aid of Reporoa Engineering and their Herdflow Dairyshed Division www.herdflow.com a plan was put in place, we all had three months to complete the whole project.  Watersmart Engineering Ltd and Lazer Electrical from Oamaru where also an integral part of the whole contracted team 

The Result:

The project was started on the 7th May 2011 and completed to the point of Cows Milking on 30th July 2011. This was in our opinion and exceptional effort and the coordination from all parties involved was outstanding. The best part of all the farmer was and still is a happy man.